3E6X1 Air Force
221 questions across 0 topics. Use the find bar or section chips to jump to what you need.
WHAT DOCUMENT OUTLINES THE BASIS OF THE CE ORGANIZATIONS?
JOINT PUBLICATION 3-34 ENGINEER DOCTRINE FOR JOINT OPERATIONS
AF INSTRUCTION 10-401 AIR FORCE OPERATIONS, PLANNING, AND EXECUTION DESCRIBES AN AEF AA WHICH CATEGORY OF DEPLOYED ORGANIZATION?
SQUADRON,GROUP, OR WING
WHAT DIFFERENTIATES AN AEROSPACE EXPEDITIONARY WING FROM AN AEROSPACE EXPEDITIONARY FORCE?
THE ABILITY TO QUICKLY DEPLOY AND ESTABLISH OPERATIONS AT NEW SITES ANYWHERE IN THE WORLD AND THE OPS TEMPO
AFCESA PROVIDES WHAT TYPE OF MISSIONSUPPORT TO MAXIMIZE AF CE CAPABILITIES?
PROFESSIONAL READINESS, ENERGY AND OPERATIONS
WHICH TERM BEST COMPLETES THE FOLLOWING STATEMENT? THE BCE WILL BE THE?
SQUADRON COMMANDER
WHO DOES THE CE FLIGHT COMMANDER REPORT TO?
BCE
WHICH POSITIONS WOULD AN OPERATIONS MANAGER TYPICALLY BE ASSIGNED TO?
CUSTOMER SERVICE UNIT REPRESENTATIVE AND SCHEDULER
WHICH CE SKILL LEVELS ARE OPERATIONS MANAGERS GENERALLY ASSIGNED AS CUSTOMER SERVICE UNIT REPRESENTATIVES?
3E631-3E651
WHICH CE SKILL LEVELS ARE OPERATIONS MANAGERS GENERALLY ASSIGNED TO AS SCHEDULERS?
3E651-3E671
WHAT 2 UNITS ARE MAJOR CONTRIBUTORS TO THE AF PRIME BEEF MISSION, DEPLOYING WORLD WIDE TO AUGMENT CE CAPABILITIES?
ANG AND AF RESERVE
WHEN DOES HO AFCESA CONDUCT A DEPLOYMENT WORKSHOP TO COORDINATE REQUIREMENTS WITH ANG AND AF RESERVE COMMAND UNITS?
ANNUALLY IN APRIL OR MAY
RAPID ENGINEER DEPLOYABLE HEAVY OPERATIONAL REPAIR SQUADRON ENGINEER (RED HORSE) UNITS DIRECTLY SUPPORT COMBAT AIR POWER?
WORLDWIDE
WHEN ANG OR AF RESERVES RAPID ENGINEER DEPLOYABLE HEAVY OPERATIONAL REPAIR SQUADRON ENGINEER (RED HORSE) UNIT MOBILIZES TO WHOM DOES THE UNIT DIRECTLY REPORT TO?
GAINING MAJOR COMMAND (MAJCOM)
MAJOR COMMANDS (MAJCOMS) ESTABLISH UNIT TYPE CODES (UTC) FOR THE OPERATIONS WITH IN THE COMMAND. THESES CODES ESTABLISH THE SIZE, COMPOSITION, AND EQUIPMENT THAT MAKEUP WHAT TYPE OF TEAMS?
PRIME BEEF
MAJOR COMMANDS ENSURE THAT PRIME BEEF OPERATIONAL AND TRAINING ACTIVITIES COMPLY WITH ENVIROMENTAL LAWS AND STANDARDS DESCRIBED IN?
AF POLICY DIRECTIVE 32-70ENVIROMENTAL QUALITY
WHO MUST ENSURE ALL PRIME BEEF TEAM MEMBERS ARE ORGANIZED, EQUIPPED, AND TRAINED TO PERFORM IN THEIR CONTINGENCY ROLES?
CE UNIT COMMANDER
WHICH AGENCY PROVIDES A CIVILIAN RESOURCE OPTION TO RELIEVE OR AUGMENT PRIME BEEF FORCES?
AF CONTRACT AUGMENTATION PROGRAM (AFCAP)
WHAT MAKES PRIME BEEF RESPONSE TIMES EQUAL TO OR LESS THAN RESPONSE TIMES FOR THE AIRCRAFT UNITS?
DELIBERATE PLANNING
BEING ASSIGNED TO A PRIME BEEF TEAM YOU MUST BE READY TO MOBILIZE ON A MOMENTS NOTICE. TO BE READY MEANS YOU UNDERSTAND YOUR DUTY RESPONSIBILITIES, MAKE SURE YOUR PERSONEL AFFAIRS ARE IN PLACE AND?
ENSURE YOUR FAMILY MEMBERS ARE PREPARED
WHICH PUBLICATION IS THE BASIS FOR ALL PRIME BEEF TRAINING?
AFI 10-210
THE PRIMARY PURPOSE OF THE CIVIL ENGINEERING TIR 3, SILVER FLAG, TRAINING IS FOR STUDENTS TO SHOW THEIR ABILITY TO PERFORM WHAT TYPE OF TASKS IN A TEAM ENVIROMENT?
CRITICAL CONTINGENCY
WHAT PROVIDES A PRIME BEEF UNIT WITH A LISTING OF ITEMS TO CARRY WHEN IT DEPLOYS?
EQUIPMENT AND SUPPLY LISTING
AS A MEMBER OF A PRIME BEEF TEAM WHAT ARE THE MINIMUM ITEMS REQUIRED IN YOUR PERSONAL DEPLOYMENT BAG?
STANDARD CLOTHING AND ACCESSORIES
WHEN YOU ASSIGNED TO A PRIME BEEF POSITION YOU ARE ISSUED A GENERAL PURPOSE BAG, AN EXTREME COLD WEATHER BAG, AND?
CHEMICAL WARFARE BAG
WHAT WILL BE YOUR PRIMARY WEAPON WHEN YOU ARE ASSIGNED TO A PRIME BEEF POSITION?
M-16 RIFLE
AS A PART OF THE OVERALL AF COMPREHENSIVE PLAN, WHICH PLAN OUTLINES INFORMATION FROM THE COMPONENT PLANS AS WELL AS OTHE PLANNING DOCUMENTS?
GENERAL
WHICH COMPONENT OF THE AF COMPREHENSIVE PLAN HELPS TO VISUALLY EXPLAIN THE NARRATIVE CONTAINED IN THE GENERAL PLAN, COMPONENT PLANS, and special plans and studies?
maps
WHICH DRAWINGS ARE USED TO UPDATE THE MASTER FACILITY COMPUTER AIDED DESIGN AND DRAFTING (CADD) FILES?
RED-LINE
WHERE ARE THE GENERALIZED VIEWS CREATED BY STRATEGIC GEOBASE LOCATED?
PENTAGON
WHAT ENABLES THE EXPEDITIONARY GEOBASE AND SUSTAINS CAPABILITIES AQUIRED AT HOME STATIONS THROUGH TRAINING?
GEOREACH PROCESS
WHAT ARE GEOSPACIAL SUPPORTING ONE OR MORE FUNCTIONAL COMMUNITIES SPECIFIC MISSIONS OR PROCESSES CALLED?
MISSION DATA SETS (MDS)
WHICH SYSTEM IDENTIFIES DUTIES AND TASKS FOR EVEY POSITION NEEDED TO ACCOMPLISH THE AF MISSION?
MILITARY PERSONEL CLASSIFICATION
WHAT DOES THE E REPRESENT IN THE AFSC 3E451?
ENGINEER CAREER FAMILY
EACH AF SPECIALITY IS COMBINED INTO A BROAD MORE FUNCTIONAL CATEGORY CALLED A/AN?
CAREER FIELD
WHAT IS THE CHIEF ENLISTED MANAGER (CEM) CODE THAT IDENTIFIES A CMSGT OR A CMST SELECT AS THE TOP ENLISTED MANAGER FOR CIVIL ENGINEERS?
3E000
WHICH SKILL LEVEL MUST YOU OBTAIN BEFORE PROMOTION TO SSGT?
5
WHAT IS THE FORUM TO CHANGE THE CFETP?
UT&W
WHICH PROFICIENCY CODES ARE USED TO IDENTIFY SUBJECT KNOWLWEDGE?
A,B,C,AND D
WHAT DOES THE AF USE TO MEASURE THE ABILITY TO RECALL METHODS,PROCEDURES,TOOLS, AND EQUIPMENT?
TASK KNOWLEDGE
WHICH PROFICIENCY CODE IS NEVER USED ALONE?
TASK PERFORMANCE
WHY DOES THE AF WANT TO PROVIDE YOU WITH TRAINING AND EDUCATION?
BUILD KNOWLEDGE AND SKILLS TO CARRY OU THE MISSION
WHICH SPECIALTY TRAINING STANDARD (STS) REFERENCE SERVES AS A DIRECTIVE FOR COMPLETING A TASK?
TECHNICAL PUBLICATIONS IN THE FIRST COLUMN
WHAT DOES A SOLID TRIANGLE IN THE QUALIFICATION TRAINING PACKAGE (QTP) SUB COLUMN OF SPECIALTY TRAINING STANDARD INDICATE ABOUT THE PACKAGE?
CURRENTLY AVAILABLE
ENLISTED MEMBERS ARE ALWAYS REQUIRED TO MAINTAIN AN AF 623, INDIVIDUAL TRAINING RECORD FROM AB THROUGH?
MSGT RETRAINEE
WHAT ELECTRONIC TRAINING PROGRAM CONSOLIDATES ALL TRAINING FORMS INTO EASY TO USE PARTS W/IN THE PROGRAM?
AFTR
WHICH SCREEN IN AFTR CONTAINS YOUR BASIC INFORMATION?
PROFILE I
WHO MUST SIGN ENTERIES ELECTRONICALLY ON THE 623A, ON THE JOB CONTINUATION SHEET SCREEN?
YOU AND YOUR SUPERVISOR
WHICH AFTR SCREEN ALLOWS YOUR TRAINER TO DOCUMENT RECURRING TRAINING SUCH AS LOCK OUT TAG OUT, HAZCOM,CPR, AND LOAC?
1098
WHERE WILL YOUR SUPERVISOR DOCUMENT ALL OF YOUR ON THE JOB TRAINING IN AFTR?
JOB QUALIFICATION STANDARDS (JQS)
WHICH DOCUMENT DO SUPERVISORS USE TO IDENTIFY TRAINING FOR EACH INDIVIDUAL IN A TRAINING SECTION?
MASTER TASK LISTING (MTL)
WITHIN HOW MANY DAYS WILL YOUR SUPERVISOR CONDUCT A TRAINING NEEDS REVIEW AFTER YOUR ASSIGNMENT TO YOUR NEW SECTION?
90
IF THE TRAINEE MEETS ALL OF THE TRAINING GOALS FOR YOUR SECTION, WHAT TRAINING CODE WILL YOU ASSIGN TO THEM?
R
WHICH TRAINING METHOD USES QUESTIONS TO CAUSE TRAINEES TO TAKE AN ACTIVE ROLE IN TRAINING/
DISCUSSION
WHICH TRAINING METHOD ALLOWS THE TRAINEE TO PRACTICE THE SKILL NECESSARY FOR COMPLETING A TASK?
PERFORMANCE
WHAT IS THE KEY TO A TRAINING COUSILING SESSION?
HONESTY
WHAT WILL GIVE YOUR SUPERVISOR GOOD INSIGHT WHERE YOU NEED TRAINING THE MOST?
CERTIFICATION TESTING PRE TEST RESULTS
IF YOU FAIL THE CERTIFICATION TEST A SECOND TIME THE PROGRAM?
LOCKS YOU OUT
WHAT TOOL IS AVAILABLE TO HELP TRAINING PROCESS FOR CORE TASKS?
AF QUALIFICATION TRAINING PACKAGE
WHAT TOOL IS USED TO IDENTIFY THE AF'S STANDARDIZED METHOD FOR PERFORMING A TASK?
AF QUALIFICATION TRAINING PACKAGE
WHAT ARE 2 FORMATS AVAILABLE FOR AN AF QUALIFICATION STANDARD?
PAPER AND WEB BASED
WHEN THE COMPLETION OF A TASKS QUALIFICATION TRAINING PACKAGE (QTP) AND PASSING THE CERTIFICATION TEST IS ALL THAT IS REQUIRED FOR UPGRADE AND QUALIFICATION TRAINING?
WHEN REQUIRED EQUIPMENT IS NOT AVAILABLE FOR INSTRUCTION
WHAT FACTORS DETERMINE ANNUAL TRAINED PERSONNEL REQUIREMENTS?
THE AMOUNT OF PEOPLE IN THE CAREER FIELD AND THE MANNING THROUGHOUT THE AF
IF YOU WISH TO ATTEND A COURSE THAT IS UNFUNDED, WHO MUST DETERMINE IF THE NEED IS GREAT ENOUGH TO WARRANT USING UNIT FUNDS TO PAY FOR IT?
UNIT TRAINING MANAGER
WHAT ANNUAL AUDIT SYSTEM WAS DEVELOPED TO ENSURE THAT THE AF'S ENVIROMENTAL PROGRAM IS OPERATING EFFICIENTLY?
ENVIROMENTAL COMPLIANCE ASSESSMENT AND MANAGEMENT PROGRAM
THE DIFFERENT KINDS OF FINDINGS FOR ENVIROMENTAL COMPLIANCE AND ASSESSMENT MANAGEMENT PLAN (ECAMP)INSPECTION INCLUDE: CARRY OVER, MAJOR, MINOR, POSITIVE, REPEAT, AND ?
SIGNIFIGANT
AN INSPECTION TEAM SHOULD COMPLETE ENVIROMENTAL COMPLIANCE AND ASSESSMENT MANAGEMENT FINAL REPORTS W/IN?
180 DAYS FOR EXTERNAL AND 120 DAYS FOR INTERNAL
WHAT ENVIROMENTAL ACT ESTABLISHES A NATIONAL ENVIROMENTAL POLICY WITH GOALS FOR THE PROTECTION,MX, AND ENHANCEMENT OF THE ENVIROMENT?
NATIONAL ENVIROMENTAL POLICY ACT
ACCORDING TO THE AF POLICY DIRECTIVE 32-70, ENVIROMENTAL QUALITY, WHO IS RESPONSIBLE FOR ACTIONS THAT HAVE ENVIROMENTAL CONSEQUENCES?
ALL PERSONNEL
WHAT DOES EMERGENCY PLANNING AND COMMUNITY RIGHT TO KNOW ACT SECTION 302 REQUIRES FACILITIES TO NOTIFY THE STATE EMERGENCY RESPONSE COMISSION AND LOCAL EMERGENCY PLANNING COMMITEE FOR?
PRESENCE OF ANY EXTREMELY HAZARDOUS SUBSTANCE
WHAT PROVIDES YOU WITH AN EXPLANATION OF THE PHYSICAL DATA OF THE CHEMICALS YOU WORK WITH?
MSDS
WHO MUST YOU NOTIFY IF YOU HAVE HAZARDOUS CHEMICALS REQUIRING AN MSDS?
LOCAL FIRE DEPT
WHAT FORM COVERS RELEASES AND TRANSFERS OF TOXIC CHEMICALS TO VARIOUS FACILITIES AND ENVIROMENTAL MEDIA?
FORM R
WHICH AGENCY LEADS THE NATION'S ENVIROMENTAL SCIENCE,RESEARCH,EDUCATION AND ASSESSMENT EFFORTS?
EPA
HOW MANY YEARS FROM THE LAST DAY THE EMPLOYEES WORKED MUST HAZARDOUS WASTE GENERATORS KEEP THEIR TRAINING RECORDS?
3
WHAT TERM IS USED TO DESCRIBED THE PROCESS OF SORTING HAZARDOUS WASTE ACTIVITIES?
HAZARDOUS WASTE ACCUMULATION
THE HAZARDOUS WASTE PROGRAM CONSISTS OF WHAT 2 INSPECTIONS OF HAZARDOUS WASTE
LEAD BASED PAINT AND DRINKING WATER
WHO SIGNS THE MANIFESTS THAT TRACK OFF BASE HAZARDOUS WASTE SHIPMENT AND RECYCLING
IDENTIFY THE SOURCE OF LEAD EXPOSURE TO INFECTED PATIENT/OTHER FAMILY MEMBERS , PROVIDE A HAZARD EVALUATION, AND RECOMMEND POTENTIAL CORRECTIVE ACTION
YOU ARE NOW THE OWNER OF SOME CHEMICALS YOU FOUND ON BASE. WHAT SHOULD BE THE FIRST THING YOU DO?
THEIR OWN PERSONAL STANDARDS
WHICH ARE 2 MAJOR SOURCES OF LEAD EXPOSURE TO CHILDREN?
RAPPORT
WHICH IS THE PRIMARY PURPOSE OF THE LEAD TOXICITY INVESTIGATION TEAM?
A POSITIVE IMAGE
WHAT DO YOUR CUSTOMERS MEASURE THE SERVICES YOU PROVIDE THEM AGAINEST
CUSTOMER SERVICE
REGARDING CUSTOMER RELATIONS WHAT TERM MEANS HAVING A RELATIONSHIP BASED ON MUTUAL TRUST
WORK ORDER #
WHAT IS MOST OFTEN GAINED BY DOING THE RIGHT THING, DOING IT ON TIME, AND DOING IT CORRECTLY
FACILITY MANAGER
WHICH AREA MONITORS THE BCE QUALITY CONTROL EVALUATION PROGRAM?
332
WHAT INFORMATION SHOULD BE PREFILLED IN ON A CUSTOMER EVALUATION FORM
1879
IF A LOW # OF CUSTOMER SATISFACTION FORMS ARE BEING RETURNED WHO SHOULD CUSTOMER SERVICE UNIT PERSONNEL CONTACT FIRST
7
WHICH AF FORM DO YOU USE AS A APPROVAL/DISAPPROVAL DOCUMENT WHEN REQUESTING WORK FROM THE CIVIL ENGINEER
WEEKLY
WHICH AF FORM IS USED FOR WORK THAT GENERALLY DOES NOT REQUIRE DETAILED PLANNING
IT REMAINS ON THE NEXT WEKS SCHEDULE AS WORKING
YOU MUST RESPOND AND COMPLETE AN URGENT WORK ORDER W/IN HOW MANY CALENDER DAYS
WORK REQUEST
HOW OFTEN DO SHOP SUPERVISORS PRODUCE RECURRING WORK PROGRMA SCHEDULES USING IWIMS
BRAIN STORMING
WHEN REPORTING LABOR WHAT HAPPENS TO AN RWP ITEM THAT DOES NOT HAVE A COMPLETE INDICATOR
JOB PHASES
WHAT CONTAINS A DETAILED DESCRIPTION OF THE WORK, WHERE TO PERFORM THE WORK, AND POC
CRAFT PHASES
WHAT IS A METHOD WHERE A GROUP OF INDIVIDUALS SIMULTANEOUSLY CONTRIBUTE IDEAS TO SOLVE A PROBLEM
LABOR UTILIZATION CODES
WHAT ARE THE SYSTEMATIC PROCEDURES FOR ANY JOB OR THE SEQUENCES FOR WORK IN ORDER OF PERFORMANCE
DIRECT
WHAT IDENTIFIES THE ORDER IN WHICH DIFFERENT SECTIONS WILL COMPLETE THEIR PORTION OF THE PROJECT
SHOP HOURLY RATE X LABOR HOURS +MATERIAL COST
WHAT TRACKS HOW LABOR IS SPENT EVERY MONTH
RESOURCES
WHICH TYPE OF LUC IDENTIFIES PRODUCTIVE LABOR HOURS
MX
WHICH FORMULA IS USED TO GET TOTAL COST OF WORK
CUSTODIAL
WHICH FLIGHT IN CE HAS THE OVERALL RESPONSIBILITIES FOR REIMBURSEMENTS
HAND RECEIPT
THE DAY TO DAY WORK REQUIRED TO PRESERVE REAL PROPERTY FACILITIES, TO PREVENT PREMATURE FAILURE, OR TO KEEP SYSTEM COMPONANTS FROM WEARING OUT IS
30
WHAT KIND OF RESPONSIBILITY DOES ANYONE POSSESSING GOVT PROPERTY HAVE AND BECOMES PERSONALLY RESPONSIBLE FOR THE PROPERTY, WHETHER USE OF PROPERTY IS OFFICIAL OR PERSONAL AND WHETHER OR NOT THERE IS A SIGNED RECEIPT FOR THE PROPERTY
OFFICE PROGRAM COORDINATORS
WHAT DO WE CALL A AF FORM 1297, TEMP ISSUE RECEIPT USED TO TRACK ACCOUNTABILITY OF AN ITEM
APPROVING OFFICIALS
ONCE AN INDIVIDUAL IS FOUND LIABLE, HOW MANY DAYS DOES THE RESPONSIBLE PARTY HAVE TO MAKE A LUMP SUM PAYMENT
DIRECTIVE AND NON DIRECTIVE
WHO ENSURES THE ORGANIZATION IS COMPLYING WITH GPC POLICIES AND PRACTICES
AFI
WHO SETS GPC SPENDING LIMITS
AFMAN
WHAT ARE THE 2 BASIC CATAGORIES PUBLICATIONS FALL INTO
32
WHICH PUBLICATIONS ARE ORDER OF THE SECAF, APPROVED IN THE SECRETARIAT OR THE AIR STAFF, WHICH ARE DIRECTIVE IN NATURE
36
WHICH PUBLICATIONS ARE EXTENTIONS OF INSTRUCTIONS AND THEREFORE ALSO DIRECTIVE PUBLICATIONS. THEY CONTAIN BOTH GUIDANCE AND PROCEDURES THAT USUALLY CONTAIN EXAMPLES FOR PERFORMING STANDARD TASKSOR SUPPORTING EDUCATION AND TRAINING PROGRAMS
PUBLICATION #
WHICH SERIES OF PUBLICATION GUIDE POLICY AND PROCEDURES ON ALL ASPECTS OF AF CE, INCLUDING MANAGEMENT OF REAL PROPERTY ASSETS
DEPT OF LABOR
WHICH SERIES OF PUBLICATION COVER POLICY ON ALL ASPECTS OF CIVILIAN AND ,MILITARY STAFFING, INCLUDING PROCURING,PROMOTION, TRAINING AND FUNDING
TECHNICAL
WHAT DOES THE SHORT TITLE SEARCH USE TO FIND THE PUBLICATION YOU ARE LOOKING FOR
TECHNICAL ORDERS
WHICH AGENCY ISSUES STANDARDS AND OTHER PUBLICATIONS THAT IMPLEMENT THE OCCUPATIONAL SAFETY AND HEALTH ACT
MARINES
WHICH COMMERCIAL PUBLICATIONS PROVIDE HOW TO ASPECT OF THE JOB
JOINT USE MANUAL
WHAT ARE THE MANUALS THE AF DEVELOPES OR PAYS A CONTRACTOR TO DEVELOPE FOR ALL EQUIPMENT BUILT TO MILITARY SPECIFICATIONS
COMMERCIAL OFF THE SHELF MANUALS
WHICH MILITARY SERVICE DEVELOPES TECHNICAL MANUALS FOR EQUIPMENT THEY USE
FIELD MX INSTRUCTION
WHICH MANUAL DOES MULTIPLE SERVICES USE AND USES A LAYOUT FOLLOWED BY THE ONE USED BY THE BRANCH OF SERVICE THAT INITIALLY HAD IT DEVELOPED
OVERHAUL INSTRUCTIONS
WHICH MANUAL COMES WITH LOCALLY PROCURED EQUIPMENT ITEMS
ILLUSTRATED PARTS BREAKDOWN
WHICH MANUAL PROVIDES INSTRUCTION FOR DESIGNATED FIELD MX UNITS IN SUPPORT OF THE USING ORGANIZATION
TO ALLOW AF PERSONNEL TO COMPLETE THE TASK IN THE SAME WAY
WHICH MANUALS PROVIDE FOR MAJOR REPAIRS OF A PARTICULAR PIECE OF EQUIPMENT
A TEAM EFFORT OF MANY KNOWLEDGEABLE INDIVIDUALS
WHICH MANUAL CONTAINS PART #S, NOMENCLATURES, AND OTHER PERTINENT INFORMATION NECESSARY TO SUPPORT THAT PIECE OF EQUIPMENT
UNTIL IT IS CANCELED RECINDED OR SUPERSEDED
WHY MUST YOU IDENTIFY ANY PROBLEMS YOU FIND IN A TECHNICAL ORDER
AFCESA PUBLICATION WEB PAGE AND US ARMY CORPS OF ENGINEERS WEB PAGE
WHAT METHOD MAKES THE BEST CORRECTION TO PROBLEMS IN A T.O.
CSS
ONCE PUBLISHED HOW LONG DOES AN ENGINEER TECHNICAL LETTER REMAIN IN EFFECT
UNIT PERSONNEL MANAGEMENT ROSTER
WHAT ARE THE 2 SOURCES YOU CAN GET ENGINEER TECHNICAL LETTERS FROM
MAXIMUM
WHO MONITORS A UNITS MANNING
ALLOWANCE STANDARD RETRIEVEL SYSTEM
WHICH PRODUCT IDENTIFIES PERSONNEL FILLING AUTHORIZED POSITIONS
INTERSERVICE
WHAT QUANITY DO ALLOWANCE STANDARDS PROVIDE FOR YOU TO PERFORM YOUR MISSION
STATEMENT OF FACTS
WHERE CAN YOU RETRIEVE INFORMATION ABOUT EQUIPMENT ALLOWANCE STANDARDS
ACCOUNT FOR CE FUNDS AS DOLLARS MOVE THROUGH THE STAGES OF SPENDING
WHAT TYPE OF SUPPORT AGREEMENT IS MADE BY THE AF AND A NAVY DETACHMENT
20000
WHICH ITEM IS ONE OF THE AGREED UPON AREAS OF RESPONSIBILITY PRESENT ON A FUNCTIONAL MOA/MOU
50000
WHAT ROLE DO COMPUTER SYSTEMS PLAY IN COST ACCOUNTING
D
WHICH COST ACCOUNT CODE IS USED FOR UTILITIES OPERATION
CHECK THAT EACH PERSON ENTER A WORK ORDER IS ENTERING THE CORRECT CODE
WHICH COST ACCOUNT CODE IS USED FOR BUILDINGS AND OTHER REAL PROPERTY MX
RESOURCES FLIGHT
WHAT STATUS ACCOUNT CODE IS ALWAYS ASSIGNED TO ACCOUNT CODE 99999
OPERATIONS MANAGEMENT AND RESOURCES FLIGHT
WHY IS A CUSTOMER ACCOUNT LISTING RUN PERIODICALLY
MINOR IN NATURE
WHICH SECTION HAS THE OVERALL RESPONSIBILITY FOR THE MX OF CUSTOMER ACCOUNT CODES
CLEANING STORM DRAINS
WHICH AREA DEVELOPES, MODIFIES, AND DELEATES COLLECTION WORK ORDER #
WHEN NO TIME OR LABOR HAS BEEN CHARGED AGAINEST THE SHOP
THE COLLECTION WORK ORDERS ARE USED TO AUTHORIZE WORK THAT IS
EVENLY AMOUNG ASSIGNED FACILITIES
WHICH TYPE OF WORK DO COLLECTION WORK ORDERS AUTHORIZE
332 BASE CIVIL ENGINEER WORK REQUEST
WHEN CAN A SHOP BE DELETED FROM A COLECTION WORK ORDER
MEASUREABLE STANDARDS
HOW ARE PERCENTAGES DISTRIBUTED WHEN MULTIPLE FACILITIES ARE INCLUDED IN THE WORKORDER TO EQUAL 100 %
UNITS OR DOLLARS
WHICH AF FORM IS INITIALLY USED TO REQUEST A SERVICE CONTRACT
TECHNICAL PROPOSALS
WHAT IS INCLUDED IN A PERFORMANCE WORK STATEMENT TO PROVIDE INCENTIVES TO PERFORM THE WORK IN A COST EFFECTIVE MANNER
DESIGN WORK AND AQUISITION LEAD TIMES
HOW ARE MINIMUM AND MAXIMUM QUANITY LIMITS SPECIFIED IN A BASIC INDEFINATE DELIVERY/INDEFINITE QUANITY CONTRACT
PRENEGOCIATED UNIT PRICE BOOK
WHAT MUST BE EVALUATED BY CONTRACTING AND SUBJECT MATTER EXPERTS BEFORE A BEST VALUE ANALYSIS CAN BE PREPARED
WORK REQUEST REVIEW BOARD
SIMPLIFIED AQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER) EXPEDITE THE CE SQUADRON CONTRACT EXECUTION BY
AF PERSONNEL WHO CAN BEST ATTEST TO THE PRODUCTS POSSIBLE BENEFITS
WHAT IS USED TO DEVELOPE DETAILED COST ESTIMATES FOR WORK TO BE PERFORMED BY SABER CONTRACTS
6 MONTHS TO 1 YEAR
WHO DETERMINES WHETHER A WORK REQUEST WILL BECOME A SABER CONTRACT
WHEN ALL TESTING AND ANALYSIS HAVE BEEN COMPLETED
WHO TESTS EQUIPMENT SELECTED FOR THE TRY BEFORE YOU BUY PROGRAM
FACILITY FILE
HOW LONG DOES THE VEHICLE AND EQUIPMENT MANAGEMENT SUPPORT OFFICE PRODUCT EVALUATION PERIOD LAST
FACILITY FILE ANOTATE REQUEST WITH THE DATE AND FACILITY IS PROJECTED TO BE TORN DOWN, FOWARD TO THE APPPROVAL AUTHORITY
AT WHAT POINT DOES THE VEHICLE MANAGEMENT AND EQUIPMENT MANAGEMENT SUPPORT OFFICE SEND A FORMAL REPORT TO THE MANUFACTURER STATING THE RESULTS
SIGNATURES
WHAT IS ACOMPREHENSIVE COLLECTION OF RECORDS FOR REAL PROPERTY INSTALLED EQUIPMENT NOT TIED TO A BUILDING
FACILITY MANAGER
WHERE CAN YOU FIND OUT IF A BUILDING IS SLATED FOR DEMOLITION, AND HOW NEW WORK ORDER REQUEST FOR THAT BUILDING BE PROCESSED
TO ENSURE PROJECT IS BEING DESIGNED OT MEET ORGANIZATIONAL NEEDS
WHAT KEY ITEM DO AUTOMATED FACILITY FILES LACK
SELF HELP PROJECTS NOT APPROVED BY CE
WHO SUBMITS NON EMERGENCY WORK REQUIREMENTS
ON AN ANNUAL BASIS
WHY SHOULD THE FACILITY MANAGER BE PRESENT DURING THE DESIGN PHASE OF A PROJECT
DD FORM 1348-1
WHAT WILL THE FIRE INSPECTOR LOOK FOR DURING A FACILITY FIRE PREVENTION INSPECTION
RISK ASSESSMENT
FACILITY MANAGERS RECEIVE REFRESHER TRAINING FROM OPERATIONS MANAGEMENT
3
WHICH FORM IS USED TO APPROVE LOCAL MANUFACTURE OF SUPPLY OR EQUIPMENT ITEMS
I ONLY
WHICH CODE IS USED TO IDENTIFY A SAFETY HAZARD OR VIOLATION ON AL WRITTEN WORK REQUESTS
ORGANIZATION COMMANDER
IN ADDITION TO THE ORIGINAL HOW MANY COPIES OF THE AF FORM 332 SHOULD BE SUBMITTED
APPROVING AUTHORITY
WHICH SECTIONS OF THE AF FORM 332 WORK REQUEST MUST BE COMPLETED BY THE REQUESTOR
32-1001
WHEN A WORK REQUEST IS FOR MINOR CONSTRUCTION, WHO SIGNS BLOCK 13 OF THE 332
J
WHO USUALLY MARKS BLOCK 15 ON THE AF FORM 332
2
WHERE ARE THE CRITERIA FOR DETERMING THE PRIORITY OF WORK FOUND
4
WHEN WORK IS ORDERED BY A DIRECT SCHEDULED WORK ORDER WHAT SHOULD THE WORK ORDER INDICATOR BE CHANGED TO
CLOSE OUT THE WORK REQUEST IN IWIMS ANNOTATE THE PROJECT # ON THE 332 AND RETURN A COPY OF THE FORM TO THE CUSTOMER OR FACILITY MANAGER
WHICH WORK PRIORITY IS GIVEN FOR WORK NEEDED TO GIVE ADEQUATE SECURITY TO AREAS SUBJECT TO COMPROMISE; TO ELIMINATE HEALTH, FIRE OR SAFETY HAZARDS ; OR TO PROTECT VALUABLE PROPERTY OR EQUIPMENT
5
WHICH WORK PRIORITY IS GIVEN TO A WORK ORDER REQUIREMENT THAT IS ASSIGNED A RISK ASSESSMENT CODE OF 5 OR A FIRE SAFETY DEFICIENCY CODE OF 4 OR 5
15
WHAT MUST YOU DO AFTER THE CONTRACT PROGRAMER CREATES A PROJECT # IN ACES-PM FROM A WORK REQUEST
SHOP SUPERVISOR
HOW MANY TYPES OF DIRECT SCHEDULED WORK ORDERS ARE THERE
RESOURCES AND HOUSING MANAGEMENT
WHAT LUC IS USED IN IWIMS FOR MINOR CONSTRUCTION
REQUIRED COMPLETION DATE
WHO DETERMINES WHICH DSW WORK ORDERS CAN BE DONE BY FACILITY MX TEAMS ALONG WITH OTHER ROUTINE REQUIREMENTS IDENTIFIED ON AF 1219, BCE MUTI CRAFT JOB ORDER
REAL PROPERTY
WHO RECEIVES A COPY OF THE COMPLETED DIRECT SCHEDULE WORK ORDER WHEN WORK IS DONE IN GENERAL OFFICERS QUARTERS
IN WRITING BY THE COMMANDER
WHAT FIELD ON THE ADD DIRECT SCHEDULED WORK ORDER SCREEN IN IWIMS SHOULD NOT BE CHANGED WITHOUT A VALID CUSTOMER REQUIREMENT
THERE ARE NO PENDING COSTS
WHAT OFFICE SHOULD BE NOTIFIED WHEN NO AF ACCOUNT CODES ARE DISPALYED WHEN ADDING A DIRECT SCHEDULED WORK ORDER IN IWIMS
5
THE DELEGATION TO AUTHORIZE A DIRECT SCHEDULED WORK ORDER IS GIVEN
DOES NOT REQUIRE DETAILED PLANNING
WHAT FACTOR ALLOWS THE IWIMS END OF SESSION TO PROGRAMATICALLY CHANGE THE WORK ORDER RECORD STATUS TO C
CAPITALIZED
HOW MANY TYPES OF WORK ORDERS ARE THERE
DRAFT WORK ORDERS
A WORK ORDER IS HANDLED AS A DIRECT SCHEDULED WORK ORDER IF IT
AJWX
ANY WORK REQUEST THAT UPGRADES, REPLACES, OR INSTALLS A SYSTEM TO REAL PROPERTY MAY NEED TO BE
SHOP SUPERVISOR
RESOURCES SHOULD NEVER BE CHARGED TO
CHIEF OF OPERATIONS
WHICH LETTERS ARE USED AS WORK ORDER IDICATORS FOR IN HOUSE WORK ORDERS
327
WHO IS APPOINTED TO MANAGE A SELF HELP WORK ORDER WHEN A UNIT DOES NOT HAVE A SEPERATE SELF HELP SHOP
CLOSEOUT
WHO NORMALLY CHAIRS THE WORK REQUEST REVIEW BOARD
AT ANY TIME DURING THE PROCESSING
BEFORE YOU BEGIN TO SPEND MONEY ON A WORK ORDER , WHICH AF FORM MUST HAVE THE CORRECT SIGNATURE ON IT
AIRFIELD
DURING WHICH PART OF THE WORK ORDER PROCESS MUST EXCESS MATERIALS BE DEALT WITH
COMMUNITY SUPPORT
WHEN CAN A WORK ORDER BE CANCELED
TRACKING
WHICH TYPE OF WORK REQUESTS HAVE TOP PRIORITY ON THE BASE FACILITY PRIORITY LIST
TYPE OF SERVICE
WHICH MISSION AREA RATING COVERS LODGING FACILITIES
REPORTS
WHICH IWIMS LOG SHOWS THE COMPLETE HISTORY OF THE MOVEMENT OF WORK REQUIRED
MATERIALS ARE ON HAND
WHICH IWIMS LOG PROVIDES THE HISTORY OF THE UPGRADE OR DOWN GRADE OF A WORK REQUIREMENT
OPERATIONS MANAGER
WHICH IWIMS FEATURE IS AVAILABLE TO HELP YOU RESEARCH YOUR WORK ORDER STATUS
10 DUTY DAYS
WHEN CAN A DIRECT SCHEDULED WORK ORDER REQUIRING MATERIAL SUPPORT BE COMPLETED W/O ASSIGNING A REQUIRED DELIVERY DATE
INSTALLATION,SHOP,MONTH
BASED UPON DIRECT SCHEDULED WORK ORDER PRIORITIES, WHO ASSIGNS A REQUIRED DELIVERY DATE TO A WORK ORDER
PROJECTED
HOW MANY DUTY DAYS BEFORE THE FIRST OF THE MONTH MUST THE FIRST FUTURE MONTH OF THE IN SERVICE WORK PLAN SCHEDULE BE FINAL PROGRAMMED AND APPROVED
WORK DELAYS, PRIORITY CHANGES, EARLY COMPLETIONS
HOW IS EACH IN SERVICE WORK PLAN RECORD IDENTIFIED
TOTAL IN SERVICE WORK PLAN BY SHOP
WHICH COLUMN OF THE MAIN IN SERVICE WORK PLAN SCREEN IS AUTOMATICALLY POPULATED WITH MAN HOUR AVAILABILITY ESTIMATES THAT ARE BASED ON HISTORICAL LABOR DATA
IWP INFORMATION BY MONTH REPORT
WHAT ARE SOME REASONS THAT WOULD REQUIRE REPROGRAMMING OF THE AVAILABLE MAN HOURS FOR EACH SHOP
THE LAST DAY OF THE MONTH THE WORK IS TO BE COMPLETED BY
WHICH REPORT PROVIDES A SUMMARY OF WHERE EACH SHOP SPENDS ITS MAN HOURS FOR A SPECIFIC TIME PERIOD
CREATE DRAFT IWP RECORDS
WHICH REPORT PROVIDES A MONTH BY MONTH LISTING OF WORK WITH PROGRAMMED MAN HOURS FOR EACH SHOP
NUMBER OF WORK DAYS FOR THE MONTH
WHEN UPDATING THE SHOP IN SERVICE WORK PLAN MAN HOURS ARE THE ESTIMATED COMPLETION DATE MUST BE SET BY WHICH OF THE FOLOWING
PERSONNEL GAINS/LOSSES AND PROJECTED LEAVE
WHAT IS THE FIRST STEP TO BUILDING THE IN SERVICE PLAN SCHEDULES
5 DUTY DAYS PRIOR TO THE END OF THE MONTH
WHAT SHOULD BE ADJUSTED TO MAKE SURE THE AVAILABLE MANHOURS ARE CALCULATED CORRECTLY WHEN BUILDING IN SERVICE WORK PLAN SCHEDULES
2
WHAT DATA SHOULD BE CONSIDERED WHEN ESTABLISHING THE IN SERVICE WORK PLAN SHOP AVAILABILITY RATE
BY THE LAST DUTY DAY OF THE PREVIOUS WEEK
THE FINAL APPROVAL/PROGRAMMING OF THE TOTAL IN SERVICE WORK PLAN BY MONTH REPORT MUST BE APPROVED BY THE OPERATIONS FLIGHT COMMANDER NTL
561
HOW MANY TYPES OF COSTS CENTERS ARE THERE
2
WHEN SHOULD YOU ENTER A WEEKLY WORK SCHEDULE INTO IWIMS
PART 1 PAGE 2
WHICH AF FORM CAN BE USED TO DEVELOPE A WEEKLY SCHEDULE
M
THE IWIMS WEEKLY WORK SCHEDULE HAS HOW MANY PARTS
39
WHICH PART AND PAGE OF THE WEEKLY WORK SCHEDULE IS USED TO SCHEDULE ALL HOURS USED FOR SUPERVISION
ADD THE PERSON TEMPORARILY FROM THE DAILY LABOR PROGRAM USING THE PERSONNEL DIRECTORY SCREEN
WHICH RWP ACTION CODE IS USED TO INDICATE A JOB HAS BEEN DEFERRED FOR MATERIALS
PERFORMANCE
WHICH LUC INDICATES A WORKER IS BEING LOANED TO AN EXCEPTION TIME ACCOUNTING COST CENTER
COST REPORTS
WHAT CAN THE CONTROLLER DO WHEN NEW PERSONNEL ARE NOT YET ENTERED IN PERSONNEL DIRECTORY BUT MUST HAVE THEIR LABOR ACCOUNTED FOR
METHOD ANALYSIS
WHAT MANAGEMENT TOOL INDICATIOR IS OFTEN ESTABLISHED BY HIGHER HEADQUARTERS TO PROVIDE MEANINGFUL MEASURE OF MERIT FOR MANAGERS TO IDENTIFY PROBLEMS AND SUCCESSES
WORK SAMPLING STUDIES
WHAT TOOLS ARE ESTABLISHED IWIMS/ACES THAT WILL HELP ASSESS RESOURCES
SERVICE RELATED
WHICH ANALYSIS TOOL CAN BE APPLIED TO ALL PROCEDURES PERTAINING TO OPERTIONS
MAINTAIN EQUIPMENT AROUND THE BASE
WHICH ANALYSIS TOOL IS USED FOR ASSESSING THE PRODUCTIVITY OF A GROUP W/IN THE MX PROCESS
LIFE CYCLE COST
SOME RECURRING WORK PROGRAM AR EOPERATIONS RELATED TO
MANUFACTUER
THE MAIN PURPOSE OF THE RECURRING WORK PROGRAM IS
MAN HOUR CEILING/PRIORITY ANALYSIS
WHAT ANALYSIS METHOD IS USED TO EVALUATE PREVENTITIVE MX VS BREAKDOWN MX
LABOR HOURS
WHO NORMALLY PROVIDES THE ESTIMATED LIFE SPAN AND EFFICIENCY DATA ON EQUIPMENT
MX ENGINEER
Looking for a different version?
CBTs get updated every year. Search for the exact version you're taking (e.g. "cyber awareness 2025").
Search all study materials